日本中文字幕无码亚洲成a人男男,国产无码偷拍,妖精成人视频,JAZZJIZZ国产精品喷孕妇

Membrane element maintenance

After a period of normal operation, the membrane element is contaminated by suspended or poorly soluble materials that may be present in the feed water. If the system performance drops by 10% under standard conditions, or if fouling or fouling is apparent, it should be cleaned in time. Regular water rinsing and chemical dosing can restore the performance of the membrane element and extend the life of the membrane element.
During the short-term shutdown of the system, the system should be flushed every 5 days, and the valve should be closed after flushing to prevent fouling.
The system was shut down for a long time (more than 30 days) and 1% sodium bisulfite solution was added to prevent bacterial growth.


Related Documents

Copy right ? 2018 Wuxi Material Science Engineering Co., Ltd. Record number: Su ICP No. 18063596

Hotline

Mrs cheng
18094269893

WeChat 2D code